          | Testing Labs |  
          | Testing is performed on the finished 
          film to confirm that it has all of the performance properties that the 
          material is supposed to provide. Testing confirms that the 
          pretreatment process is working correctly, providing the necessary 
          properties to the substrate prior to coating application. Testing also 
          confirms that the powder has been properly applied and cured. Initial 
          testing of a coating process is used to establish a standard. Periodic 
          testing is done to confirm that  the process is able to maintain 
          the standard. Panels for coating tests are run through the washer and 
          then coated the same as production parts. The panels are usually aged 
          for 24 hours at room temperature prior to testing.
 
 |  
          | Th Coaters Test 
        Laboratory
 Shop No 1 & 2, 
        Shree Sadan, 90 ft Road
 Sane Guruju Mulund (E)
 Mumbai 400 081
 Tel 568 4659
 Fax 568 2810
 |  
          | Kripton Powder 
        Paints Pvt. Ltd.
 Plot No D 94 MIDC 
        Satpur
 Nashik 422007
 Phone 0253 2363500
 Particle Size Analysis
 Particle Size Analysis from 0.4 microns to 2000 microns
 We have coulter particle size analyzer which can analyze the particle 
        size from 0.4 to 2000 microns. This is lesser diffraction based machine 
        is most accurate. The report can be obtained in the form of graph, 
        statistics, listing at each interval cumulative greater than and 
        cumulative less than. The percent of particle can be judged by either 
        percent by number or by surface area percent by volume. The report will 
        be submitted in the form of hard copy.
 
 
 |  | 
 |  |